Project: wcooper   -  
            Listing of Entries
    (Please mouse-over any icon to get a description of that function).


  
Builder Name:William Cooper   -  
Project:   Vans - RV-10   -   VIEW REPORTS
Total Hours:29.5
Total Flight Time:
Total Expense:$175687.69
Start/Last Date:Jan 29, 2019 - No Finish Date
Engine:Lycoming YIO-540-D4A5 RT(Y)
Propeller:Hartzell C2YR-1BFP/F8068D
Panel:Garmin
 
Friendly URL: https://eaabuilderslog.org?s=wcooper

Home or Last Project Picture

Apr 27, 2022     Control Column       Category: Flight Controls
39-7 step 1 has you match drill the Control Sticks and the Control Stick Bases which was a little tricky. One of the Control Sticks wasn't exactly square so getting it to line up wasn't as easy as planned. The outside of the stick and the inside of the base had to be cleaned as it was a tight fit. Then installation of the WD-1010 Control Column. Had to remove the seat pan covers which wasn't too difficult. Just a few screws on each side. Then the control column slides into a slot on the tunnel sides. Then attach the column to the Control Column Mounts. Again with fitting washers on the inside edges of the bases. This time access was much better and it didn't take too long to accomplish.


 


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.